MANIFOLD

 

  • Fittings placed on separate frame or brackets
  • Possibility to connect several stations for high heating and cooling power
  • Covered / open version
  • High quality

Contact us for more information.

Contact
  • Description
  • Standard equipment
  • Blog

Different configurations, different designs, manifolds, auxiliary and connecting fittings according to specific requirements. Modular TCU racks for mounting small number of single circuit TCUs in common frame using common connection.

  • Insulated / non-insulated design
  • Covered/open design
  • Fixed / flexible mounting on frame / bracket
  • Shut-off valves
  • Drain valves
  • Integrated Management System (IMS)

    | 29. 07. 2022
    Ing. Marián Ivaška

    Company IPECON, s.r.o. has created, implemented and used Integrated Management System (IMS). The implementation of activities, procedures and processes in IMS are made in accordance with standards ...

    More
    logo certifikačnej spoločnosti
  • Quality management system - H1 module

    | 28. 09. 2021
    Ing. Marián Ivaška

    Based on the audit performed, the certification body for quality systems (TUV Rheinland) confirmed the implementation and application of a quality system that meets the requirements of the European Directive 2014/68 / EU. IPECON,…

    More
    logo TUV Rheinland
  • Welding certification - ISO 3834-2

    | 27. 04. 2020
    Ing. Marián Ivaška

    This part of ISO 3834 specifies the complete quality requirements for fusion welding of metallic materials, both under shop conditions and at the installation sites. At IPECON,…

    More
    logo TUV Rheinland
  • New forklift with higher capacity in company

    | 06. 03. 2020
    Ing. Milan Remiš

    Electric forklift STILL RX60-50 helps us with increased needs of loads handling. The forklift is manufactured according to the latest technological standards. It uses front wheel drive ...

    More
  • Plasmanitrided welding tables with accessories

    | 22. 03. 2019
    Marcel Milučký

    In order to optimize welding work, we have purchased this system. The basis of the kit are welding tables, to which are fastened with special fastening pins a lot of…

    More
  • Production history in IPECON - Production progress

    | 05. 10. 2018
    Marcel Milučký

    For more than 20 years, the history of IPECON has been linked to our own production of our products. A brief summary of the main milestones of this period, from which it is clear…

    More
  • Labeling of products and elements

    | 13. 04. 2018
    Marcel Milučký

    A long-term standard in IPECON, s.r.o. is the labeling of products with quality product labels containing identification and basic technical data. Control and signaling elements, cables and more…

    More
    tlačiareň štítkov
  • New software in the design department

    | 15. 11. 2017
    Ing. Marián Ivaška

    After problems with stability and insufficient performance of the original program, a new solution for the design department was sought. Alternative solutions were tested and based on good experience was…

    More
    softvér PTC Creo
  • We have expanded assembly and storage space

    | 05. 07. 2016
    Ing. Milan Remiš

    Continuous increase in production volume did not allow us to work only in the existing premises. That is why we have expanded our assembly and storage space by an area of…

    More
  • The new warehouse speeds up our production

    | 12. 03. 2016
    Ing. Maroš Kopernický

    We moved the warehouse of production components to new larger area. The receipt and expedition of material for individual orders is more efficient.  

    More
  • IPECON - Division of Heating Technology and Power Engineering

    | 10. 05. 2013
    Ing. Richard Čemeš

    Looking for a reliable supplier and partner? IPECON has been a reliable partner for its customers for 25 years. We offer years of experience in the field of heat engineering and power engineering…

    More