PRESSURE DEPENDENT HEAT RESET STATIONS

 

  • CE certificate
  • Low investment costs
  • High durability and reliability
  • Installation as compact or CH and DHW blocks
  • Decentralized DHW fast-heating
  • Unattended operation and easy maintenance

For more information please contact us.

Contact
  • Description
  • Standard equipment
  • Blog

Pressure-dependent Heat exchange stations IPC TZ provide decentralized preparation of DHW and CH in residential and industrial buildings. They are typically used as home automation stations when switching to a two-pipe system.

The stations are designed as compact units with the MaR system, heat exchangers, control elements and circulation pumps. They can be delivered compact or as separated CH and DHW blocks. The control valve at the DHW exchanger inlet controls the flow of primary medium through the exchanger, thereby regulating the DHW temperature at the outlet on the secondary side. Control of the CH water outlet temperature to the building is provided by a three-way control valve by mixing the CH return water into the outlet. Equithermal regulation based on ambient air temperature is used. The control system allows day and night attenuation programs that can be customized according to user's requirements. In addition to the CH and DHW control, it is also possible to control the differential pressure at the inlet to the station. This will ensure stable hydraulic conditions in primary system. The station can be controlled by any control system according to customer requirements thanks to the use of unified sensors and actuators. This will allow to integrate the station into an existing system. The performance and dimensions of the elements used depend on the application. The ppower of circulation pumps and heat exchangers is designed according to the real energy characteristics of the building.

  • Integrated Management System (IMS)

    | 29. 07. 2022
    Ing. Marián Ivaška

    Company IPECON, s.r.o. has created, implemented and used Integrated Management System (IMS). The implementation of activities, procedures and processes in IMS are made in accordance with standards ...

    More
    logo certifikačnej spoločnosti
  • Quality management system - H1 module

    | 28. 09. 2021
    Ing. Marián Ivaška

    Based on the audit performed, the certification body for quality systems (TUV Rheinland) confirmed the implementation and application of a quality system that meets the requirements of the European Directive 2014/68 / EU. IPECON,…

    More
    logo TUV Rheinland
  • Welding certification - ISO 3834-2

    | 27. 04. 2020
    Ing. Marián Ivaška

    This part of ISO 3834 specifies the complete quality requirements for fusion welding of metallic materials, both under shop conditions and at the installation sites. At IPECON,…

    More
    logo TUV Rheinland
  • New forklift with higher capacity in company

    | 06. 03. 2020
    Ing. Milan Remiš

    Electric forklift STILL RX60-50 helps us with increased needs of loads handling. The forklift is manufactured according to the latest technological standards. It uses front wheel drive ...

    More
  • New workshop equipment: Resistance welding

    | 29. 04. 2019
    Marcel Milučký

    We have purchased a new Pneumatic Stand Pointing Machine with swing arm, which allows us to increase our work productivity and production efficiency of our products. The basic parameters are:…

    More
  • Plasmanitrided welding tables with accessories

    | 22. 03. 2019
    Marcel Milučký

    In order to optimize welding work, we have purchased this system. The basis of the kit are welding tables, to which are fastened with special fastening pins a lot of…

    More
  • Production history in IPECON - Production progress

    | 05. 10. 2018
    Marcel Milučký

    For more than 20 years, the history of IPECON has been linked to our own production of our products. A brief summary of the main milestones of this period, from which it is clear…

    More
  • Labeling of products and elements

    | 13. 04. 2018
    Marcel Milučký

    A long-term standard in IPECON, s.r.o. is the labeling of products with quality product labels containing identification and basic technical data. Control and signaling elements, cables and more…

    More
    tlačiareň štítkov
  • New software in the design department

    | 15. 11. 2017
    Ing. Marián Ivaška

    After problems with stability and insufficient performance of the original program, a new solution for the design department was sought. Alternative solutions were tested and based on good experience was…

    More
    softvér PTC Creo
  • We have expanded assembly and storage space

    | 05. 07. 2016
    Ing. Milan Remiš

    Continuous increase in production volume did not allow us to work only in the existing premises. That is why we have expanded our assembly and storage space by an area of…

    More
  • The new warehouse speeds up our production

    | 12. 03. 2016
    Ing. Maroš Kopernický

    We moved the warehouse of production components to new larger area. The receipt and expedition of material for individual orders is more efficient.  

    More
  • IPECON - Division of Heating Technology and Power Engineering

    | 10. 05. 2013
    Ing. Richard Čemeš

    Looking for a reliable supplier and partner? IPECON has been a reliable partner for its customers for 25 years. We offer years of experience in the field of heat engineering and power engineering…

    More